PSRI() - Priority schedule index
| Type
| Field
| Description
|
| double
| dDays
| Number of days
|
| double
| dWorkHrs
| Number of working hours per day
|
| double
| dTime
| Total remaining processing time
|
| double
| dRemOper
| Number of remaining operations
|
PowerBuilder Function declaration
function double PSRI(double dDays, double dWorkHrs, double dTime, double dRemOper) library "IFL16.DLL"
Visual Basic Function declaration
Declare Function PSRI lib "IFL16" (ByVal double dDays, ByVal dWorkHrs As Double, ByVal dTime As Double, ByVal dRemOper As Double) As Double
C/C++ Synopsis
#include "function.h"
double PSRI(double dDays, double dWorkHrs, double dTime, double dRemOper)
32 bit DLL declarations
PowerBuilder Function declaration
function double PSRI(double dDays, double dWorkHrs, double dTime, double dRemOper) library "IFL32.DLL"
Visual Basic Function declaration
Declare Function PSRI lib "IFL32" (ByVal double dDays, ByVal dWorkHrs As Double, ByVal dTime As Double, ByVal dRemOper As Double) As Double
C/C++ Synopsis
#include "function.h"
double PSRI(double dDays, double dWorkHrs, double dTime, double dRemOper)
Example:
| dDays
| =
| 10
|
|
| dWorkHrs
| =
| 8
|
|
| dTime
| =
| 30
|
|
| dRemOper
| =
| 5
|
|